Engineering - Roadways and Bridges

CONTACT INFORMATION:
Engineering Manager

Mark P. Guess, PE, CPESC

Phone: (731) 644-1014
Fax: (731) 644-0109
Tollfree: 1-800-247-6847

mguess@lismith.com



www.ieca.org

 

 

L.I. Smith has provided surveying and engineering services for the multiple roadway and bridge projects throughout the region.

Recent Projects

Tennessee Trail
Henry County, Tennessee

Survey and design of 4 miles of County Road to accommodate a new Golf Course. Project included any additional right-of way, drainage calculation, sight and stopping distance, structural thickness design, alignment, and overall road template.

SR76
Stewart County, Tennessee

Route Survey to establish the alignment and remaining topography, property lines, and utilities for the widening of SR 76 from the Cumberland River Bridge to Papa Rock.

SR 100
Chester County, Tennessee

Construction Survey for three-lane widening of SR 100 in Chester County, Tennessee.

Henry County Bridge Replacements
Henry County, Tennessee

L.I. Smith provided surveying and engineering services for the Henry County Bridge Replacements Program. A total of 7 bridges and box culvert replacements were performed within a 3 year period and includes the following: Nanny Road, Bear Creek Road, Mt. Sinai Road, Gum Springs Road, Wade Road, Clayton Town Road, and Nichols Road.

OTHER RELATED ENGINEERING
PROJECTS:


Commercial/
Residential Land Development
>

Water, Sewer
and Utilities
>

Environmental
Engineering
>

Industrial/
NPDES Permitting

Lakes and Dams >

Roadway and
Bridge Replacement
Projects
>

Material Testing
and Construction
Layout
>

 

Site Map | Locations | Contact Us | Careers
CONTACT L.I. SMITH FOR ALL YOUR SURVEYING AND ENGINEERING NEEDS.